Loading...
2487 ORDINANCE NO. 2—� y AN ORDINANCE WAIVING COMPETITIVE BIDDING FOR REPAIRS OF LAYNE PUMP NUMBER 88367,DECLARING AN EMERGENCY AND FOR OTHER PURPOSES. WHEREAS, Arkansas Code Annotated Section 14-58-303 allows waiving of competitive bidding in exceptional situations where such procedure is deemed not feasible or practical; and WHEREAS,there are many items necessary for the City's use where competitive bidding is deemed not feasible or practical; and WHEREAS,the City of West Memphis and the West Memphis Utilities are in need of having parts removed from Well 5 and repairs made to Layne Pump Number 88367 and the pump has been inspected by Layne Christensen Company, and competitive bidding under such circumstances would not be feasible or practical; NOW,THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WEST MEMPHIS,ARKANSAS: 1. That competitive bidding be waived for the following item to be used by the City, described as follows: Removal of parts from Well 5 at an estimated cost between$20,740.00 and$52,012.00 and repairs to Layne Pump Number 88367 at an estimated cost of$62,940.50. 2. EMERGENCY CLAUSE. It having been found and determined by the City Council of the City of West Memphis,Arkansas,that the repair of pump 88367 is necessary to maintain well number 5 which a vital part of the water supply for the City of West Memphis and that there is an urgent and immediate need for said repairs to be completed, an emergency is hereby declared to exist, and this Ordinance being necessary for the preservation of the public peace, health, safety and welfare of the Citizens of West Memphis, Arkansas, shall be in full force and effect from and after the date of its passage and approval. PASSED AND APPROVED this,�41_dayliDD l • , 2018. ` e. i WILLIAM H. JO SON, Mayor ATTEST: 4ILLIP PARA, City Clerk SPONSORED/BY: / RECEIVED City Clerk's Office Dto a �,lz By Layne Arkansas a division of Layne Christensen Company P.O. Box 1210, Stuttgart, AR 72160 Phone: 870-673-1591 Date: December 2, 2018 Job Number: 51540 Customer: Evergreen Packaging Customer PO: QUANTITY DESCRIPTION UNIT TOTAL Well 5, rebuild pump Serial Number 88367. Column pipe had separated allowing the majority of pump to fall into in well. 1 New 3 stage 14RJ pump bowl, cast iron bronze fitted 11961.00 11961.00 1 Disassemble & inspect recovered column assembly, assemble 1684.00 1684.00 1 Pull column couplings 322.00 322.00 180 Ft. epoxy coating, 10"column pipe 28.78 5180.40 180 Ft. epoxy coating, 2.5"oil tubing 5.30 954.00 10 Shaft couplings, 1.5 26.40 264.00 3 Column pipe, 10x19'9-5/8 1503.64 4510.92 1 Column pipe, 10x20'top special, w/lugs 1724.00 1724.00 9 Oil tubing & shaft assembly, 3x1.94x20ft 809.10 7281.90 6 Nipples welded on column pipe ends &threaded 168.00 1008.00 6 Column pipe ends refaced, filed 11.00 66.00 6 Combination column couplings, 10x2.5 575.00 3450.00 8 Spider bushings, 2.5 33.35 266.80 1 Oil, grease, paint, packing, tape, varsol 122.00 122.00 10 F-M ISO-32 food grade turbine pump oil 36.18 361.80 16 Permatex, tube 15.42 246.72 16 Silicone, tube 8.82 141.12 6 Machine bolt, 5/8x1-1.4 0.93 5.58 12 Machine bolt, 7/80-1/2 3.44 41.28 4 Machine bolt, 5/8x2-1/2 1.09 4.36 1 Machine new drive shaft, 238.00 238.00 1 Adjusting nut, 1-15/16 84.00 84.00 1 Gib key 21.82 21.82 1 Suction pipe 514.40 514.40 18 Tape, plastic, 3/4" 1.55 27.90 1 Lot, banding straps & buckles, 3/4" 184.00 184.00 1 Electrical tape, rubber&#33 24.00 24.00 1 Check, clean, face& paint stuffing box 62.00 62.00 1 Check, clean, face& paint pump head 164.00 164.00 1 Tension bearing, 2.5x1.5 478.00 478.00 1 Clean, check & repair oiler&fittings 24.00 24.00 180 Ft. stainless steel airline 2.67 480.60 1 Gauge, airline, 460ft 34.82 34.82 1 Gauge, pressure, 120# 6.75 6.75 1 Gasket, 10" 8.93 8.93 1 Clean, inspect, test, repair 150 hp US Motor 460.00 460.00 1 Motor bearing, #6215 54.05 54.05 22 Hrs.,pump rig rental & 3 man crew, attempt to remove pump 185.00 4070.00 22 Hrs., Additional Helper 47.00 1034.00 3 Days service truck 150.00 450.00 1 Crew expenses 1398.00 1398.00 24 Hrs.,pump rig rental & 3 man crew, install pump 185.00 4440.00 24 Hrs., Additional Helper, estimated 47.00 1128.00 3 Days service truck, estimated 150.00 450.00 1 Crew expenses 1398.00 1398.00 Estimated additional cost for attempting to remove the pump in the well -$20,740 to $52,012.00 Sub-total 56831.15 0.065 AR State Tax 3694.02 0.0275 County Tax 1562.86 0.015 City Tax 852.47 ITotal 62940.50 Ward Wimbish From: Kristin Carpenter 'Flo 70z - Sent: Monday, December 03, 2018 9:22 AM To: Ward Wimbish Subject: FW:Water Well 5 Attachments: West Memphis Water Utilities 51540 Well #5 estimate.pdf From: Everett Burge<Everett.Burge @gcinc.com> Sent: Sunday, December 02, 2018 10:10 AM To: Kristin Carpenter<kcarpenter@citywm.com>; Todd Pedersen (tpedersen@ciwest-memphis.ar.us) <tpedersen@ciwest-memphis.ar.us> Subject: Water Well 5 Good morning, Layne recently sent a pump crew to remove the vertical turbine pump from Well 5 due to excessive vibration of the pump. The crew found the column pipe had come apart. They attempted to pull the pump by the oil tubing; however, the pump fell into the well. We were able to remove the 150 horsepower motor, pump head, 120 feet of 10" column pipe and 60 feet of oil tube and shaft assembly. The parts which are still in the well are the suction pipe, pump bowl, 60 feet of 10" column pipe and 120 feet of oil tube and shaft assembly. We suspect these parts are now resting on the top of the 10 inch inner well casing which our records indicate starts at a depth of 1352 feet. There are two approaches to consider. The first is to simply rebuild/replace the pump and install it in the well with the hope the old parts will not impede the flow of water coming from the well. We have attached an estimated cost for this approach. The downside of this attempt is we would not know if the well will still produce water until we have installed the pump and test pumped the well. The second approach is to attempt to fish out the parts. The estimated depth of the parts, around 1300 feet, make this a costly endeavor with no guarantee of success. Special tools are needed for this type of operation and multiple attempts may be necessary. An estimated cost for trying to remove the parts is shown at the bottom of the attached. This type of work is performed on a time and materials basis under the terms and conditions of Layne's Confirming Order. There is some possibility some of the parts could be reconditioned and reused in rebuilding the pump. Please contact us with your questions. Everett "Rett" Burge LAYNE I water+mineral+ energy 2015 South Main.Street,PO Box 12103 j Stuttgart,AR E 72160 e(: 870-674-8373 Fax:870-573-2990 Everett.Burge@layne.com www.layne.com 1 www.graniteconstruction.com i