2188 RESOLUTION NO. -z- f
A RESOLUTION APPROVING THE REVISITION OF THE 2019 BUDGET
WHEREAS, A.C.A. § 14-58-203 states the governing body may alter or revise the budget
and unpledged funds appropriated by the governing body for any purpose may be
subsequently, by action of the governing body, appropriated to another purpose.
WHEREAS, the Budget Committee deems it necessary to request a change in the
approved budget for 2019.
WHEREAS, the total amount of the changes are $19,125.00.
WHEREAS, the City Council of the City of West Memphis, Arkansas, finds that the
request for changes in the approved Budget for 2019 has met all the requirements as stated in
this statute and it is appropriate that the requested changes should be approved;
NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WEST
MEMPHIS, ARKANSAS, approves the $19,125.00 change in the 2019 Budget, and this resolution
shall be in full force and effect from and after the date of its passage and approval. See Exhibit
A attachment.
PASS AND APPROVED this day of W" , 2019.
Ma co McClendon, MAYOR
ATTEST:
V
Joyce Gray, CITY CLERK
SPONSORED BY:
RECEIVED
City Clerk's ffic-
Daterioa
Attachment
Proposal
Date: 3/1/2019
I
Bid To: City of West Memphis Job: Petro Cove Asphalt Maintenance
Attn: Amanda Hicks
Address:
Phone: Fax:
Email:
LINE# QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
1 30 TON Asphalt Levelling $ 115.00 $ 3,450.00
2 110 TON 2"Asphalt Patching&Overlay $ 125.00 $ 13,750.00
3 1 LS Maintenance of Traffic S 1,250.00 $ 1,250.00
4 1 LS Mobilization $ 675.00 $ 675.00
TOTAL S19,125.00
Authorized Rep Date
Authorized Rep Date
r
p J
IMT� 1 ns
r
LJJ
►�
y ui
Ju
0 w r !.
uj
ef
i�] F �•
y • f..may�F���•
<.� - _ .'_. .._ _ .- _ _ _ �� ' �re+,f- "'111••. ��
(I 9w
f2 ��
rt.
C j
1511ti CI'iu.-I,PSo[I Afire.
'res` ve i'phis, AR. /2-A I
A 1: Li,l0-7 3 J11'
PROPOSAL and CONTRACT
To: City of West Memphis
Attn: Amanda Hicks
Effective Date: 3/1/19
Crisp Contractors, Inc. offers to furnish all labor, materials and equipment required
for the performance of the following described work:
Description of Work and Price:
Asphalt Overlay of Petro Cove
30 Tons Asphalt Leveling @ $$120.00/ton = $3,600.00
110 Tons Asphalt Patch & Overlay 2" Thickness @ $130.00/ton = $14,300.00
1 Lump Sum Mobilization @ $2,000.00 = $2,000.00
Total Price of $19,900.00
Unless "Lump Sum" or"LS" appears next to an item of work, it is understood and
agreed that the quantities referred to above are estimates only and that payment shall be
made at the stated unit prices for actual quantities of work performed by Crisp Contractors,
Inc. This proposal expires thirty (30) days from the effective date of this Proposal.
Payment in full for all work performed during any month shall be made not later than
the tenth (10th) day of the month next following. Final and complete payment for all work
performed hereunder shall be made not later than fifteen (15) days after the completion of
such work. Interest at the highest rate allowable under the laws of the in state which the
work is done, or one and one half percent (1'/2%) per month, whichever is less, shall be
charged and paid on all unpaid balances from the due date to the date we receive payment.
You agree to pay in full all costs and expenses incurred by Crisp Contractors, Inc. in
1
collecting the amounts owed by you under the Agreement, including any and all court costs
and attorneys' fees. Payments received will be applied against open items on unpaid
invoices in an order and sequence determined by Crisp Contractors, Inc. in its sole
discretion. Any monies paid to you for our work shall be held in trust for our benefit.
We shall not become obligated to perform the work called for under this Proposal
and Contract until we check and approve your credit. This Proposal and Contract shall be
null and void if your credit is not approved. If credit conditions become unsatisfactory at any
time prior to our completion of the work hereunder, you will furnish adequate security upon
our request. To the extent you fail to provide adequate security, we may stop work.
This document is the full agreement between us, regardless of any prior proposals or
communications. Any deviations from the specifications or modification of the terms of this
contract and any extra or incidental work, or reductions in work, shall be set forth in writing
and signed by both parties prior to the making of such change. We will be compensated for
any increase in our costs caused by such change, on the basis of the increase plus ten
percent (10%) profit. If a time is set for the performance of work, and if, in our judgment,
such change or other circumstances beyond our reasonable control will increase the time
necessary for our performance, we will be granted a reasonable extension of time.
We will provide and pay for Workers' Compensation covering our employees, as well
as General Liability and Property Damage Insurance. You agree to carry General Liability
and Property Damage Insurance sufficient to protect yourself against any and all claims and
liabilities arising from the performance of the work, including but not limited to claims arising
under your agreement to indemnify and hold us harmless under this contract.
We shall be provided with suitable access to the work area. If our work is dependent
upon or must be undertaken in conjunction with the work of others, such work shall be so
performed and completed as to permit us to perform out work hereunder in a normal
uninterrupted single shift operation.
Unless a time for the performance of our work is specified, we shall undertake it in
the course of our normal operating schedule. We shall not be liable for any failure to
undertake or complete the work for causes beyond our control, and we may suspend the
work for causes beyond our control, including but not limited to fire, flood or other casualty;
the presence on or beneath the work site of utilities, facilities, substances, or objects,
including but not limited to any substance that in our opinion is hazardous or toxic or the
reporting, remediation, or clean-up of which is required by any law or regulation (together
"subsurface conditions"); labor disputes or other disagreements; and accidents or other
mishaps, whether affecting this work or other operations in which we are involved, directly or
indirectly.
If for causes beyond our control our work is not completed within twelve (12) months
after the date of your acceptance of the proposal, we may cancel this agreement at any time
thereafter on ten (10) days notice. In such event (i) we shall be relieved of any further
obligation with respect to the balance of the work; and (ii) we shall be entitled to receive final
and complete payment for all work performed by us to the date of cancellation within fifteen
(15) days thereafter.
We shall not be responsible for, and you agree to indemnify and hold us harmless
from, any suit, claim, liability, cost or expense arising from or in any way related to:
sidewalks, driveways or other improvements located within our work area or designated
areas of access, and to adjacent property and improvements; subsurface conditions; and
any and all other alleged damages to persons or property, including but not limited to
personal injury and death, arising from the performance of the work, unless such alleged
damages arise from our sole negligence. You further agree to indemnify and protect us and
save us harmless from any and all loss, damage, costs, expenses and attorney's fees
suffered or incurred on account of your breach of any obligations and covenants of this
contract. It is further understood that we shall not be responsible for any damage to or
deterioration of any of our work, whether completed or in process, resulting from any cause
or causes beyond our reasonable control, including but not limited to design, failure of
subgrade or other subsurface conditions, or failure or inadequacy of any labor or materials
not furnished and installed by us, whether or not such failure or inadequacy was or could
have been known at the time our work was undertaken or work performed under adverse
weather conditions. You agree that the proper jurisdiction and venue for adjudication
concerning this contract is Crittenden County, Arkansas, and you waive any right to
jurisdiction and venue in any other place.
If you agree to these terms, prices and conditions, please acknowledge acceptance
by signing in the space provided on the second page and returning the original to us,
retaining a copy for your files. The person signing for Crisp Contractors, Inc. represents that
he or she is fully authorized to enter into this Agreement.
ACCEPTED: Crisp Contractors, Inc.
(Firm Name) Title:
By:
(Name and Title)
(Date)