Loading...
2662 ORDINANCE NO. 2‘62- . AN ORDINANCE TO ESTABLISH FEES FOR PERMITS AND INSPECTIONS AT RESIDENTIAL RATES AND COMMERCIAL AND INDUSTRIAL RATES WITHIN THE CITY LIMITS OF WEST MEMPHIS, ARKANSAS. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WEST MEMPHIS,ARKANSAS: SECTION 1. ORDINANCE REPEAL: That Ordinance No. 760, Article IV, Section 2,passed and approved, February 1, 1973; and Ordinance No. 797, passed and approved, February 21, 1974; and Ordinance No. 801, passed and approved, March 21, 1974; and Ordinance No. 959,passed and approved, April 5, 1979; and Ordinance No. 2586, passed and approved October 7, 2021, be void and repealed. SECTION 2. DISTINCTION OF PERMIT FEES: Distinction of Residential, Commercial, and Industrial permits, plumbing, building sewer, water service line, and gas permits shall be distinguished Residential at one rate: and, Commercial and Industrial at another rate. The determination of whether Residential, Commercial, or Industrial shall me made according to the present zoning of the City of West Memphis, that the structure being permitted - is located. This location shall be determined by the administrative authority in the plumbing division. One (1)and two (2) family housing units on one (1) lot shall be classified residential; - and, any more family housing units in a structure on one (1) lot(i.e. apartment complex) shall be -classified commercial. SECTION 3. PERMITS: Permit fees are determined as provided in Attachment"A". SECTION 4. REQUIRED: In accordance with Ordinance No. 2341 any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this Code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. A permit shall not be valid until the fees prescribed by law have been paid, nor shall an amendment to a permit be released until additional fees, if any, have been paid. Each permit shall be paid in accordance with the schedule established by the ' applicable governing body. SECTION 5. PENALTIES FOR VIOLATIONS: Any person violating any of the provisions of this ordinance or any rule or regulation established and prescribed under Sections 105 or 109.1 of the Arkansas Fire Prevention Code (2012) shall be subject to fines in accordance with the City of West Memphis Code of Ordinances Part 1 Section 1-7. SECTION 6. VALIDITY CLAUSE: If any section, sub-section, sentence, clause or phrase of this Ordinance is for any reason held to be unconstitutional or otherwise invalid, such unconstitutionality or invalidity shall not affect the remainder of this Ordinance and all ordinances or parts of ordinances in conflict herewith are hereby repealed. PASSED AND APPROVED this l day of , 202'V yRpo CO M. McCLENDON, Mayor ' ATTEST PATRICIA JOPL , City Clerk SPONSORED BY: RECEIVED City Clerk' �d7J# �oFwesr46'4, CITY OF - • WEST = � -* MEMPHIS ARKANSASS • Backflow Preventer/Sprinkler System .Permit Application Please be aware that if work starts•prior'to obtaining a permit the permit fee•;will be doubled, and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within.24 hours,an additional$100/day will be assessed until a-permit is obtained. All work must STOP until a permit is approved and paid for. Applicant: - • Contact Number: . • E-Mail Address: - Address: • Property Owner: • Property Owner's Address: Classification of work: 0 Residential 0 Commercial Estimated Cost; •' •. • • Fee for Backflow Preventer/Sprinkler System Permit - Backflow Preventolr/Sprinkler System $50 • If the job is commercial a 5%stag tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I HEARBY CERTIFY THAT I•HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND,CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative'when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE;.FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: Date: - Planning& Development 870-732-7520 �F tEsr,yF,y CITY OF • f Y: WEST , .� MEMPHIS . • A R K A N, S A .S Commercial Building Permit Application Please be aware that if workstarts prior,.to Obtaining a permit the permitfee will be doubled,and a$100 fine will be assessed for the first 24 hours.If a permit is not obtained within 24 hours;an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant:— _ ' Contact Number: E-Mail Address: Address: Property Owner: . • Property Owner's Address: Classification of work: 0 New Construction 0 Addition , 0 Remodel Total Square Feet: Estimated Cost: '• Fees for Building Permits (A) New Constructions and Additions,to Existing Structures • r. A Fee of$.15 a square foot with a minimum charge of$45.00 as well as a 5%state tax fee for the total cost of the job,will.be charged for each permit issued. (B) Remodeling of Existing Structures A fee of$1.25•per one thousand dollars of value with a minimum charge of$45.00 as well as a 5% state tax fee for the total cost of the job will be charged for each permit issued for remodeling of structures. • • (C) Other Types of Construction - A fee of$1.25 per one thousand dollars of value with a minimum charge of$45.00 as well as a 5% state tax fee for the tG al;cost of the job will be charged for each permit issued. In addition to the•above fees, separate permits are required to be obtained for ELECTRICAL, MECHANICAL, PLUMBING AND/OR GAS. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work:commences.I HEARBY CERTIFY THAT'I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND'CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES.GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHERSTATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: -_ Date: , Planning& Development 870-732-7520 of ES F.y CITYOF * • . '� � * A WEST R MEMPHIS * • * A ARKANS • Commercial Electrical Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled, and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours;an additional$100/day will be assessed until a permit•is obtained. All work must STOP until a permit is approved and paid for. Applicant; - Contact Number: E-Mail Address: Address: • Property Owner: • • Property Owner's Address: ' Classification of work: 0 New Construction 0 Addition 0 Remodel •' Circuits: Estimated Cost: Service Entrance: _ :Fees for Electrical Permits (A) Commercial Electrical Application Fee $40 (B) Apartment(s)Per Meter Base $40 • (C) Industrial Per Meter Base $40 (D) Service Entrance: 1) First—100 AMPS •. . $3.00 , 2) 200 AMPS—1200 AMPS $2.00 per 100 AMPS 3) Over 1201 AMPS $1.50 per 100 AMPS (E) Circuits: 1) First Circuit $3.00 2) 2"a_10th Circuit $1.50 • 3) More than 10 Circuits . $1.00 A 5%state tax fee for the total cost of the commercial job will be charged for each permit issued. In addition to the above fees, separate permits are required to be obtained for BUILDING, MECHANICAL, PLUMBING AND/OR GAS. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I HEARBY.CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made.INSPEc IONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING, TEMPORARY ELECTRICAL,ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • Signature: S Date: - Planning& Development 870-732-7520 • ,oF`" MF CITY OF WEST =� ; MEMPHIS ARKANSAS Commercial Plumbing Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant: ' Contact Number: E-Mail Address: Address: • Property Owner: • Property Owner's Address: Classification of work: 0 New Construction 0 Addition 0 Remodel Service Entrance: Circuits: Estimated Cost: Fees for Plumbing Permits _ 1) 1-4 Openings/Minimum Permit $60 2) 5-9 Openings $88 3) 10-14 Openings $96 • 4) 15-20 Openings $105 5) 21-25 Openings • $112 • 6) 26-30 Openings $124 7) 31+ $1.00 Each A 5%state tax fee for the total cost of the commercial job will be•charged for each permit issued. In addition to the above fees, separate permits are required to be obtained for BUILDING, MECHANICAL, ELECTRICIAL AND/OR GAS. - The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I NEARBY CERTIFY THAT.I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND'CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN•OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative`when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE;FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • Signature: Date: • Planning& Development 870-732-7520 es MF CITY OF cc" A-. WEST • i MEMPHIS ARKANSAS • 1t PA Demolition Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. • Applicant; . .: Contact Number: =Mail Address: - Address: • Property Owner: • Property Owner's Address: . Classification of work: ❑ Residential 0 Commercial. Total Square Feet: Estimated Cost: Fees for Demolition Permit - (A) Demolition A Fee of$,06 a square foot with a minimum charge of$45.00 will be charged for each permit issued. • If the job is commercial a 5%state'.tax fee for the total cost of the job will be charged for each permit issued. • • • The permit becomes null and void if construction;w.ork does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I HEARBY CERTIFY THAT I.HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND,ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN,OR NOT.THE GRANTING OF A PERMIT-DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:,SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • Signature: - -- -- --------- - Date: Planning& Development 870-732-7520 ��,0F Es MF A CITY OF ' . ;" . WEST I MEMPHIS A R K A NI S AA S. Driveway Permit Application Please be aware that if work starts prior to obtaining a permit the permit.fee will,be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant:- Contact Number: • • E-Mail Address: Address: • Property Owner: • Property Owner's Address: • Classification of work: ❑.Residential ❑ Commercial Estimated Cost: Dimensions: Fee for Driveway Permit 1) Driveway Permit $45 • If the job is commercial a 5%state tax fee for the total cost of the job will be charged for each permit issued. • The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after•work commences.I HEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.,ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT-PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative'when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: - Date: Planning& Development 870-732-7520 • • Esr4 *Ark F', CITYOF • 4 -a y • WEST • .fi MEMPHIS� '. 1 • A R K A N S A S :Gas. Permit Application . - Please be aware that if work starts prior to obtaining a permit the permitfee will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an.additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant: . - - Contact Number: ' .. • E-Mail Address: Address: Property Owner: • Property Owner's Address: • Classification of work: ❑ Residential 0 Commercial Number of Outlets: Estimated Cost: Fees for Gas Permit (A) This includes gas piping,4.outlets, pressure inspection, rough out inspection and final gas test. 1) Residential $30.00 2) Commercial $40.00 3) Additional Outlets . . • $1.50 each . ' If the job is commercial a 5%state tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction.work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I HEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION-AND HAVE FOUND THE SAME TO BE TRUE AND„CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN•OR'NOT.THE.GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • • Signature: Date: ' Planning& Development 870-732-7520 e *EST MF+A CITY OF r .. . WEST $� •• MEMPHIS ARKANSAS Residential Buildin Permit.A �lic g pp cation Please be aware that if work starts prior to obtaining a permit the permit,fee will be doubled,and a$100 fine will'be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. . Applicant: . Contact Number; E-Mail Address: - Address . . Property Owner; . Property Owner's Address: , .• Classification of work; ❑ New Construction 0 Addition 0 Remodel Total Square Feet: Estimated Cost: Fees for Building Permits (A) New Constructions and Additions to Existing Structures . A Fee of$.12 a square foot with a minimum charge of$45.00 will be charged for each permit issued. (B) Remodeling of Existing Stri ctu'res:' . : A fee of$1.25 per one thousand dollars of value with a minimum charge of$45.00 will be charged for each permit issued for remodeling of structures. , • (C) Other Types of Construction - A fee of$1.25 per one thousand dollars of value with a minimum charge of$45.00 for each permit issued. . •. I . In addition tithe above fees, separate permits are.required to be obtained for • ELECTRICAL, MECHANICAL, PLUMBING AND/OR GAS. • The permit becomes null and void if•construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at acy,tin,e after work commences.I NEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND.THE SAIVIE�TO BE TRUE AND CORRECT.AL'L PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE,CO,IVIPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE,PROVISIONS OF ANY,OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION. If application,is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS: SITE,FOOTINGS,SLAB,ROUGH PLUMBING,.INTERIOR PLUMBING,TEMPORARY ELECTRICAL,ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING''AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. . Signature: Date: . Planning& Development 870-732-7520 .1/4 CITY OF WEST. .+ M EM PH I S ARKANSAS Residential Electrical Permit Application Please be aware that if work starts prior to obtaining a permit the permit tee will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant:- Contact Number: E-Mail Address: Address: Property Owner: . Property Owner's Address: Classification of work: Cl New Construction 0 Addition 0 Remodel Service Entrance: Circuits: Estimated Cost: Fees for Electrical Permits • (A) Residential Electrical Application Fee $30 (B) Service Entrance: 1) First 100 AMPS • $3.00 2) 200 AMPS—1200 AMPS. '.,,;.:, $2.00 per 100 AMPS 3) Over 1201 AMPS , • • .•` $1.50 per 100 AMPS - ' , (C) Circuits: 1) First Circuit $3.00 2) 2nd—10th Circuit $1.50 3) More than 10 Circuits . , , $1.00 • • In addition to the above fees, separate permits are required to be obtained for BUILDING, MECHANICAL, PLUMBING AND/OR GAS. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I NEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE•AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER,STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. . Signature: - Date: Planning& Development - 870-732-7520 • • • �*.. FAA CITY OF , , WEST R*. .- MEMPHIS, ARKANSAS Residential Plumbing Permit Application - Please be aware that if work startspriorto obtaining a permit the permit fee'will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. • Applicant: • - Contact Number: E-Mail Address: • Address: Property Owner: , Property Owner's Address: • Classification of work: ❑ New Construction ❑ Addition ❑ Remodel • Service Entrance: ' •Circuits: Estimated Cost: ' . .': Fees for Plumbing Permits 1) 1-4 Openings/Minimum Permit . $45 2) 5-9 Openings $68 3) 10.1.4 Openings $76 • 4) 15-20 Openings $84 . 5) 21-25 Openings . $92 • • 6) 26-30 Openings • $100 7) 31+ $1.00 Each • In addition to"the.above fees, separate permits are required to be obtained for :. :i.';`RUIEAINe;.MECHANICAL, ELECTRICIALAND/OR:GAS. • The permit becomes null and void if construction work•does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after,work commences.I HEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND'CORRECT:ALL,PROVISIONS OF LAWS AND'ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION:If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:'SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • • Signature: , •. Date: Planning& Development • 870-732-7520 h�o Es 44, 414 CITY OF �' . * WEST *. I MEMPHIS A R K A.N S A S' Sewer Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled, and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is.approved and paid for. Applicant: Contact Number: • E,,Mai)Address: Address: • Property Owner: . Property Owner's Address: - Classification of work: ❑ Residential 0 Commercial Estimated Cost: • _ Fees for Sewer Permit (A) Residential Permit Fees:. , • 1) Minimum Permit $30 2) Additional Trip $30 3) Negligence Trip $75 (B) Commercial Permit Fees: 1.) Minimum Permit - . ' : $40 • • 2) Additional Trip • $40 3) Negligence Trip $75 If the job is commercial a 5%state tax fee for the total cost of the job will be charged for each permit issued. • The permit becomes null and void if constructiori,work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I HEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN:OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:'SITE;•FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • Signature: Date; Planning& Development 870-732-7520 • ,Es �,� CITYOF:. WEST MEMPH1$ R KA S A S. • Sign Permit Application' Please be aware that if work starts prior to obtaining a permit the permit fee'will'•be doubled,and a$100 fine will be assessed for the first 24 hours.If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit•is obtain ed?:All,work'mustlSTOP until a permit is,approved and paid for. Applicant: _.-_... Contact Number. E=Mail Address: Address: , . • • . r Property Owner: q. Property Owner's Address: - Classification of work: D New Sign: In Change.Out.. Estimated Cost: i Fees for Sign Permit • • 1). Minimum $45.00 - . 2) Per Square Ft,Per Sign $0.75 If the job is commercial a 5%;state tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I HEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECTcALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN:OR_NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative:when work is"to be started and.when.all'different,types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:'SITE;.FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION:CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: Date: Planning& Development = 870-732-7520 ' • _'40o1 Es N'/1320d,„, CITY OF ' •. . « WEST 4rillA 4 .44. .�4-, MEMPHIS ' ' A R K- A N S A S '' - Slab: Permit Application . Please be aware that if work starts prior to obtaining a.permit the permit fee will'be'doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant: '' - Contact Number: • E Mail Address: Address: . ' - Property Owner:, :• Property Owner's Address: • -,- , Classification of work: ❑ Residential 0 Commercial Estimated Cost: Dimensions: • . Fees for Slab Permit I) .Slab.Permits-are$A©. . , . • If the job is commercial,a 5,%.state-tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction.work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time afteriwork commences.I.HEARBY CERTIFY THAT I HAVE READ AND'EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME.TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:-SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • Signature: _ - --- - • ' Date: Planning& Development 870-732-7520 • ,; o ,Esr CITY OF °s WEST. • - .t MEMPHIS _ r Storage;Building: Permit Applicat• ion Please be aware that if work starts prior.to obtaining a.permit the permit fee will be,doubled,and a$100 fine will be assessed for the.first 24 hours.If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained All work must STOP until permit is,approved and paid for. Applicant: — • • Contact Number; E Mail Address: Address: — Property Owner: Property Owner's Address: Classification of work: 0 Residential ❑ Commercial Estimated Cost: ___ • _ •_ _ Dimensions: - Fee for StorageBuilding Permit 1) . .$.12per.square,foot or Minimum.of.$45 If the job is commercial a 5%state tax fee for the total cost of the job will be charged for each permit issued. • The permit becomes null and void if construction work;does not commence within,6 months or if construction work is suspended or abandoned for a period of 6 months at,any time after work,commnces.I:HEARBY CERTIFY THAT I•HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND;CO,RRE9T d.,PROVISIONS OFLAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN ORNOT.THE GRANTING OF A PERMIT DOES*NOT PRESUMETO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his'representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS.FOLLOWS:,SITE,FOOTINGS,SLAB,ROUGH PLUMB,ING,'INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL.CONNECTION,GAS;MECHANICAL,FRAMING AND A FINAL INSPECTION..CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: __ _ _. • Date:' Planning& Development 870-732-7520 • of ST"'F4,. CITY OF • � WEST • .° MEMPHIS ARKANSAS • .Water Permit Application• ' Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled, and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant: • Contact Number: • E-Mail Address: • Address: • Property Owner: Property Owner's Address: • Classification of work: ❑ Residential 0 Commercial Estimated Cost: ••��•�Fees for Water Permit (A) Residential Permit Fees: L) Minimum Permit • $30 : 2) Additional Trip $30 • 3) Negligence Trip ,- ' . • ' $75 • • (B) Commercial Permit Fees: 1) Minimum Permit $40 2) Additional Trip $40 3) Negligence Trip $75 - • If the job is commercial a 5%state,tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I NEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION-AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED-HEREIN"OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF-ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. • • - Signature: Date: Planning 84 Development 870-732-7520 " f • 4.0,wE5T 04,, CITY OF A* WEST ••. .* MEMPHIS ARKAN S A S HVAC Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant: Contact Number: E-Mail Address: Address: Property Owner: Property Owner's Address: - Classification of work: ❑ Residential 0 Commercial Estimated Cost: Size of Air Conditioning System: Fees for HVAC Permit (A) HVAC Permit Fees: 1) 5 Tons or Less $40 2) 6.Tons to 10 Tons $70 3) Each Additional Ton over 10 $10 If the job is commercial a 5%state tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I NEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT STARTUNTIL PERMIT APPROVED. . Signature: Date: • - Planning& Development 870-732-7520 ��OFWEST 44' CITY OF WEST • . .• .MEMPH_ IS A R K A N S A S;. Swimming Pool Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a.permit is approved and paid for. Applicant: • Contact Number: E-Mail Address: • Address: Property Owner: Property Owner's Address: Classification'of work: 0 Residential 0 Commercial Estimated Cost: . Dimensions: Fees for Swimming Pool Permit • 1) Minimum , $75.00 2). PerSquare Ft(Residential) $0.20 3) Per Square Ft(Commercial) $0.30 If the job is commercial a 5%state tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I NEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: Date: . Planning& Development , • • 870-732-7520 sF IEST yF CITY OF - : WEST . . .• MEMPHIS ARKANSAS • Fence Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled,and a$100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. • Applicant: Contact Number: E-Mail Address: Address: 0 Property Owner: Property Owner's Address: Classification of work: ❑ Residential ❑ Commercial - Estimated Cost: Dimensions: You will need one copy of the plot plan with the dimensions. Work drawn does not have to be exact,but reasonably close. Fee for Fence Permit (A) First 250 LF/Minimum $45 (B) First 250 LF/Minimum(Commercial) $50 (C) Each Addition 100LF $1.75 Prior to starting,a registered engineer must stake property lines.All fences must have 3-foot clear openings to allow utility or drainage easement to be accessed. If the job is commercial a 5%state tax fee for the total cost of the job will be charged for each permit issued. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences.I HEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO • VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION.If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made. INSPECTIONS TO BE MADE ARE AS FOLLOWS:SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL, ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: .. Date: Planning& Development 870-732-7520 � wesrMF�q CITY OF WEST . • MEMPHIS ARKANSAS Roofing Permit Application Please be aware that if work starts prior to obtaining a permit the permit fee will be doubled,and a $100 fine will be assessed for the first 24 hours. If a permit is not obtained within 24 hours,an additional$100/day will be assessed until a permit is obtained. All work must STOP until a permit is approved and paid for. Applicant: Contact Number: E-Mail Address: Address: Property Owner: Property Owner's Address: • Total'Square Feet: Estimated Cost: Fees for Roofing Permits (A) Roofing of Existing Structures A fee of$1.25 per one thousand dollars of value with a minimum charge of$45.00 for each permit issued. The permit becomes null and void if construction work does not commence within 6 months or if construction work is suspended or abandoned for a period of 6 months at any time after work commences. I HEARBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND HAVE FOUND THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITH WHETHER SPECIFIED HEREIN OR NOT.THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE THE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION. If application is granted,I/We agree to notify the building inspector or his representative when work is to be started and when all different types of inspections are to be made.INSPECTIONS TO BE MADE ARE AS FOLLOWS: SITE,FOOTINGS,SLAB,ROUGH PLUMBING,INTERIOR PLUMBING,TEMPORARY ELECTRICAL,ELECTRICAL,ELECTRICAL CONNECTION,GAS,MECHANICAL,FRAMING AND A FINAL INSPECTION.CONSTRUCTION WORK WILL NOT START UNTIL PERMIT APPROVED. Signature: Date: Planning& Development.. 870-732-7520 • ' er ission ' ,es uest To: City Council From: Tori Perry Date: 1/26/2024 • Permission to Shred any financial documents, payroll, UT office documents, UT Plant documents, HR documents, etc. for 2018 and before. Thanks, Tori Perry Finance Director • RECEIVED • (No subject) . Candra Suiter<csuiter.airport@gmail.com> Thu 1/25/2024 10:15 AM To:Patricia Lane <plane@westmemphisar.gov>;waynecroom@yahoo.com <waynecroom@yahoo.com> Highlights from today's commission meeting: Susanna Cook with Garver Engineers reported that in February there will be a pre construction meeting with Crisp Contractors to get a clearer projected start date for the north apron rehab project. It was also reported that RFQ's (request for qualifications) have been sent out to engineering firms in order to stay compliant with FAA guidelines. The deadline for submittals is Feb. 1st at noon. Candra Suiter 1 Airport Manager West Memphis Municipal Airport 737 S.Airport Road West Memphis,AR 723o1 S70-735-4656 • • • • • ' I •