Loading...
05/15/2025 • WEST MEMPHIS UTILITY COMMISSION P Q Box 1868 604 East Cooper 4,- West Memphis, AR 72301 , Phone: 870-735-3355 Fax: 870-732-7623 May5, 2025 Accept Hemphill Construction Company the low bid for West Memphis Utility Commission Sewer System CIPP Rehabilitation approved by the Utility Commissioners RECEIVED C' leri�'� A b , f • FISHER ARNOLD ENGINEERS I ARCHITECTS I CONSULTANTS I PLANNERS May 5,2025 Mr.Bob Atkins West Memphis Utility Commission P.O.Box 1868 West Memphis,AR 72301 RE: GRAVITY SEWER SYSTEM CIPP REHABILITATION Dear Mr.Atkins: As you are aware, bids were received on May 1, 2025, for the above-mentioned project. This project, which consists of the rehabilitation of approximately 21,400 LF of 8-inch through 24-inch gravity sewer lines and replacement of approximately 389 sewer cleanout assemblies, is an integral part of a larger overall plan to fulfill those requirements placed on the City by ADEQ. As can be seen in the attached Certified Bid Tabulation,three bids were received ranging from$3,997,900.00 to $4,651,554.00. Having reviewed each bid tendered along with supporting documentation supplied by each bidder, it is our recommendation that an award be made to Hemphill Construction Company,Inc.in the amount of$3,997,900.00. If you have any questions concerning this project,or our recommendation,please do not hesitate to contact me at this office. Sincerely, FISHER&ARNOLD,INC. Tim Verner,P.E. Senior Vice-President TV/tv Certified Bid Tabulation Attached 9180 Crestwyn Hills Drive Memphis,Tta 38125 901.748.1811 Fax:901.748,3115 Toll Free:1.888.F83.9724 www.fisherarnold.com r ^ WEST MEMPHIS UTILITY COMMISSION GRAVITY SEWER SYSTEM CIPP REHABILITATION WEST MEMPHIS,ARKANSAS BID TABULATION MAY 1,2025 HEMPHILL CONSTRUCTION • BLD SERVICES I SAK COMPANY,INC. ITEM DESCRIPTION 4UANTlTY UNIT TOTAL UNIT I TOTAL. UNIT TOTAL NO. PRICE) PRICE PRICE I PRICE PRICE PRICE 1 !Mobilization 1 LS $93,611.00r $93,611.001 $220,000.00 $220,000.001 $176,000.001 $176,000.00 2 Traffic Control Devices for Construction Work Zones 1 LS $7,500.001 $7,500.00} { $50,000.001 $50,000.00 $49,600.00 $49,600.00 3 IBycass Pumping 1 ` LS $15,000.001 $15,000.00 550,000.001 $50,000.00 $61,000.00 $61,000.00 4 18"CIPP 13,816 LF $44.00 $607,904.00 $62.00 $856,592.001 $52.00 $718,432.00 5 110"CIPP 3,060 LF $50.00 5153,000.00) $68.00 $208,080.001 $52.00 $159,120.00 6 12"CIPP 1,724 LF ` $57.00 $98,268.00 $78.00 $134,472.001 $71.00 $122,404.00 7 15"CIPP 11,640 LF I $92.00 $150,880.001 $90.001 $147,600.00 _ 599.001 $162,360.00 8 18"CIPP fl 729 LF $127.00 $92,583.00 $125.00. $91,125.00 L $129.00 $94,041.00 — 1 9 24"CIPP I 442 . _LF $187.00_ $82,654.00 $175.00 $77,350.00 y , $166.00 $73,372.00 10a Sewer Service Cleanout in Roadway 148 EA $7,500.00, $1,110,000.00 $5,300.00 $784,400.00 $3,318.00 $1,231,064.00 10b Sewer Service Cleanout in Easement 241 EA $6,500.00_ $1,566,500.00 $5,000.00, $1,205,000.00 $7,421.00 $1,788,461.00 11 Site Preparation and Restoration 1 LS $5,000.00 $5,000.00 $600,000.00 $600,000.00 $10,500.00 $10,500.00 12 Trench&Excavation Safety 1 LS _$15,000.00 $15,000.00 $50,000.00 $50,000.00 $5,200.00 $5,200.00 TOTAL BID $3,997,900.00 _ I $4,474,619.00 $4,651,554.00 CERTIFICATION: I certify that the above is a true and accurate tabulation of the bids received by the West Memphis Utilities Commission,604 East Cooper Avenue,West Memphis,Arkansas 72301 @ 2:00 p.m.,Thursday May 1,2025. ' P 1 • ' .b t% 'i FISHER& ..... / \:- L.�1 n S o r t - t ARNOLD,INC. ENG.1 EER #gas ' 3 N+�'+14 N 9 qq, -;;%z5 g41. ks s `'w� John T.Verner