Loading...
January 9, 1952M1NU'1'~5 UN' H1V HllJUUnrvrlJ r.~r:.~1'lrvu ur intr L11i l~VU1Vli1L ~r lnr, v11J. yr r~r~l i+~+uni.~, ruu.n,vu.w, HAl? ANP_ .HELD ON JANUARY ~:_ 152 The Council of the City of ~Yest L";emphis met in an adjourned session at the City Hall in said City at F3;00 p.M. on the yth day of January, 1952. The meeting was called to order by the LZayor, and the roll being called there vrere: Present: Mayor YY. B. Fordyce in the chair and the following named Aldermen: 0. 1. Bollinger, C. H. Rowton, A. n. "`anchester, James Bledsoe, Freeman Finley, P. B. Powers, ". L. garrison, and Curtis Foster; City httorney J. H. .tip ears, and City Clerk Kenneth Hollis. Absent: None. The following proceedings were had to=rrit: Mayor Fordyce announced that aria was an adjourned meeting of the City Council for the sole purpose of consideration of the Memphis View Housing Project; that Mr. Wallace Johnson, contractor, his attorney, his engineers and various other persona were present, and that the meeting was now open for discussion. The Mayor advised those present that a long term view of the matter had been taken by the City Council, and that it was the intent and desire of the Council to establish a precedent to be followed by other develop HS; that there were numerous other projects under consideration and that it was the desire of the Council to evolve a plan whereby other developers might bring property into the City and that this be done in a uniform maruxer as to payraent for streets, utilities, and the development of the various subdivisions generally. He further advised the sponsors of the Liemphis View Housing Project, after a careful study of the matter, that the City eras willing to do the following: 1. That the contractor construct or pay the cost of construction of the distribution system for electric lights and the City would then reimburse the contractor for the costs of tk~e electric light distribution system. 2, That the contractor construct or ply for the cost of construction of water line and that the City would then reimburse the contractor for fifty percent of the costs of the water system, and this fifty percent to be paid out of earnings. 3, That the contractor construct tine sewer system, however, the City would pay the difference between the cost of the construction of the small line contemplated by the developers of the project and the larger line requested by the City for the outfall sewer line. 4. The contractor construct all streets, curbs and gutters with no reimbursement by the Gity. After discussion of the proposal, the Contractor advised that he would not be able to proceed with the project under the proposal, and a counter proposal was offered that the City construct the utilities and the sum of :LQ60,000.00 be contributed by the Contractor to the cost of the utilities. After a lengthy discussion of the matter, dayor Fordyce advised that tine City would not take arty action on the matter at tkiis time, and it would be necessary to adjourn the meeting until a later date. Thereupon, motion was made by Alderman Foster and seconded by rilderrnarx Bledsoe to adjourn the rneetang until 7:30 P.2d. Friday, January 11, 1952• Upon the matter being called to vote, the following voted: Aye: Bollinger, Rowton, Manchester, Bledsoe, i'inley, Powers, Garrison, and Foster. Nay: None. ATTL:iT: C CL APPROVED: JANUARY 15, 1952