Loading...
2743 r - ORDINANCE NO. 2026-043 AN ORDINANCE AMENDING THE WEST MEMPHIS DEVELOPMENT CODE TO ESTABLISH THE ADVANCED ENERGY AND TECHNOLOGY OVERLAY DISTRICT; PROVIDING FOR ITS APPLICATION UPON ELECTION OF THE LANDOWNER; AND FOR OTHER PURPOSES. WHEREAS,the Grow West Memphis 2040 Comprehensive Plan identifies the Employment Center place type as the intended framework for intensive, employment-generating investment, and directs the City to remove barriers to advanced industry and infrastructure; and WHEREAS, advanced energy generation, storage, and delivery, together with digital infrastructure, represent a category of employment-generating investment of exceptional benefit to the City, West Memphis Utilities, and the region; and WHEREAS, the West Memphis Development Code provides at Section 3.2(C) for overlay districts that may permit uses not otherwise permitted in an underlying base district and whose standards prevail over the base district in the event of conflict; and WHEREAS, the Planning Commission has recommended approval of this Ordinance to the City Council; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WEST MEMPHIS, ARKANSAS: • • SECTION 1. Article 4 of the West Memphis Development Code is amended to add the following Section 4.24: 4.24 Advanced Energy and Technology Overlay Purpose— The Advanced Energy and Technology Overlay ("AETO") is intended to implement the Employment Center place type and the economic development goals described in Grow West Memphis 2040 by providing, as uses permitted by right, for advanced energy and technology development. The Overlay is intended to attract and expedite investment of exceptional public benefit while preserving the City's paramount interest in public health and safety. Typical Buildings and Structures — Generation, storage, transmission, and fuel facilities; data and computing facilities; advanced manufacturing and research facilities; and their accessory buildings and structures. • Applicability and Election — The AETO is available to, and shall be applied to, any parcel located within an Employment Center(Industrial)base district(I-1, I-1C,or I-2), upon the written election of the landowner filed with the Director of Planning and Development, provided that the Applicant and West Memphis Utilities have entered into a letter of coordination regarding utility 'ECEIVED Non-binding For discussion puiposes only Dat-.�� e/I/ < y - , f�L� • service to the parcel, which coordination may be further documented through a service or interconnection arrangement as the project matures. Application of the Overlay upon such election is ministerial, and shall not be unreasonably withheld,delayed, or encumbered; the conditions to application are that the parcel lie within an eligible base district and that the West Memphis Utilities coordination described above be in place. A parcel not located within an eligible base district must first be reclassified to an eligible Employment Center (Industrial) base district by zoning map amendment before the Overlay may be elected. Use and Intensity Within the AETO, and notwithstanding the Table of Uses (Table 5.1) or Section 1.6(B), the following are permitted by right. The following categories are illustrative and not exclusive, and any other advanced energy or technology use, and any accessory use of similar character, is likewise permitted by right: A) electric power generation, conversion, and associated generating equipment, including, without limitation, natural-gas-fired generation, advanced nuclear energy systems, fuel cells, combined heat and power systems, waste-heat recovery systems, geothermal systems, hydrogen-capable generation, and other dispatchable or advanced energy technologies; provided,.however, that: (i) a principal-use, ground-mounted solar energy generation facility exceeding five megawatts alternating current (5 MWac),shall not be permitted by right and may be approved only pursuant to a conditional use permit in accordance with this Code; and (ii) a principal-use or utility-scale wind energy generation facility, shall not be permitted by right and may be approved only pursuant to a conditional use permit in accordance with this.Code; . 1) a solar energy installation shall not be considered a principal-use, ground-mounted solar energy generation facility where it is located principally on rooftops,building façades,parking canopies, or other previously developed improvements, or where it is accessory to and primarily serves an on-site permitted use. 2) a wind energy installation shall not be considered a.principal-use or utility-scale wind energy generation facility where it is accessory to and primarily serves an on- site permitted use, provided that it complies with the applicable height, setback, airport-protection, and other requirements of this Code. 3) In considering a conditional use permit for a principal-use ground-mounted solar energy generation facility or a principal-use or utility-scale wind energy generation facility, the reviewing authority shall consider compatibility with surrounding and planned land uses; preservation of land suitable for long-term employment- generating development;potential interference with the orderly expansion of such uses; and applicable access, screening, drainage, decommissioning, and site- restoration measures. For wind energy facilities, the reviewing authority shall also • consider height, setbacks, noise, shadow flicker, aviation safety, required FAA or Non-binding I For discussion purposes only 2 c-' airport-related determinations, radar and communications interference, lighting, and other identifiable impacts associated with the proposed location. B) energy storage of any type, including battery energy storage systems and thermal, mechanical, chemical, hydrogen, and other advanced energy storage,technologies; C) electrical substations, switchyards, and electrical transmission, distribution, . and interconnection facilities; D) natural gas,hydrogen,and other fuel gathering, metering, regulation, compression, storage, and related infrastructure; E) data centers, high-performance and artificial-intelligence computing, and telecommunications facilities; F) advanced manufacturing, research, and development; G) water supply, treatment, reclamation, and cooling infrastructure; H) accessory office, control, operations, maintenance, security, utility, and support uses; and I) any other use consistent with the Purpose of this Overlay. All dimensional and intensity standards are governed by the requirements of the underlying base district, except as this Overlay otherwise provides. Development Standards —Development within the AETO shall comply with the building, fire, and life-safety codes of the City and with customary site plan review directed to public safety, access, and utility service. The protection of public health and safety is paramount.. All development shall obtain and maintain all federal and state licenses, permits, approvals, and authorizations required by applicable law; approval under this Overlay constitutes local land-use authorization only and does not supersede or substitute for any such approval. The Director of Planning and Development and the building official may impose reasonable, project-specific conditions within their respective administrative authority, and, where approval is expressly required by this Code, the Planning Commission 'may recommend and the City Council may impose reasonable conditions to ensure compliance with this Code and applicable law and to address identifiable impacts to public health, safety, access, utilities, or adjacent uses. Any condition of approval shall be reasonable, customary, and commensurate with conditions applied to'comparable permitted uses, and no condition shall be imposed that is overly restrictive or that unreasonably withholds, delays, or encumbers development. Site Specific Elements and Processes A) Overlay Election. Administrative, upon written election of the landowner to the Director of Planning and Development. B) Site Plan Review. Customary site plan review as provided in this Code,directed to public safety, access, and utilities.. Non-binding I For discussion purposes only 3 C) Building Permits. Issued upon satisfaction of the building, fire, and life-safety codes and customary site planning best practices. District Exceptions and Notes —Where the standards or uses of this Overlay conflict with those of the underlying base district or the Table of Uses, this Overlay shall prevail, .consistent with Section 3.2(C). Nothing in this Overlay waives or diminishes the building,fire, or life-safety codes of the City. SECTION 2. The Table of Districts in Article 3 is amended to add the following designation: "AETO —Advanced Energy and Technology Overlay," classified as an Overlay district; and the contents of Article 4 are amended to add "4.24 Advanced Energy and Technology Overlay." SECTION 3. If any provision of this Ordinance or its application is held invalid, such invalidity shall not affect other provisions or applications that can be given effect without the invalid provision, and to this end the provisions of this Ordinance are declared severable. SECTION 4. All ordinances, resolutions and parts thereof in conflict with herewith are hereby repealed to the extent of such conflict. SECTION 5. This Ordinance shall take effect and be in force from and after its passage and approval. APPROVED and ADOPTED this day of , 2026. ATTEST: 6a1 ;i:—J • Mayor y Clerk y (SEAL) CITY OF WEST MEMPHIS, ARKANSAS • Non-binding For discussion pu,poses only 4