Loading...
1692ORDINANCE NO . I6~a. AN ORDINANCE TO WAIVE COMPETITIVE BIDDING FOR THE PURCHASE OF TWO GORMAN-RUPP MODEL T4A3B (4X4) SELF PRIMING CENTRIFUGAL SEWAGE PUMPS AND FOR OTHER PURPOSES. WHEREAS, Arkansas Code Annotated Section 14-58-303 allows waiving of competitive bidding in exceptional situations where such procedure is deemed not feasible or practical; and WHEREAS, the City of West Memphis and the West Memphis Utility Commission are in need of replacing the sewage pumps in the OK Street Pump Station, and WHEREAS, all wastewater employees of the West Memphis Utility Commission have been factory trained in the maintenance and repair of Gorman-Rupp model T4A3B self priming centrifugal sewage pumps and the Utility Commission currently stocks repair parts for this model sewage pump; and WHEREAS, it is the recommendation of the Wastewater Superintendent that the sewage pumps in the OK Street Pump Station be replaced with Gorman-Rupp model T4A3B self priming centrifugal sewage pumps; and ~ WHEREAS, competitive bidding under such circumstances would not be feasible or practical; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WEST MEMPHIS, ARKANSAS: 1. That competitive bidding be waived for the following items to be used by the City of West Memphis and the West Memphis Utility Commission: Two (2) Gorman-Rupp Model T4A3B (4X4) self priming Centrifugal Sewage Pumps. 2. Competitive bidding is being waived for the reason that the West Memphis Utility Commission has an immediate need to replace the sewage pumps in the OK Street Pump Station and the wastewater employees are currently trained in the maintenance and repair of the recommended model and the Commission currently stocks repair parts for the recommended model. PASSED AND APPROVED this ~ day of ~u~u S , 1995. ~ P~_ AL BOALS, Mayor RECEIVED CITY CLERK OFFICE DATE o~r 9~ ~°~~~ ~- ~~/~~~,(~, i~ Otility\pa~ps.ord 2 SPONSORED BY: A P R- 1 7- 9 5 M O M 1 2 3 1 W M F` OK ST. PUMP STATION PROJECT COST ESTIMATE SEWAGE P MPSRUVEEMBELT DRIVENiBY45HPE3PHPMOTORS ONNTARIFUGAL FABRICATED STEEL BASE WITH BELT GUARD. TOTAL COST DELIVERED TO JOB SITE= 8,280.00 + TAX ASSORTED PIPING, FITTINGS AND CONNECTIONS TOTAL ESTIMATED COST= 2,900.00 UPGRADE OF ELECTRICAL CONTROLS TOTAL ESTIMATED COST= 750.00 TOTAL ESTIMATED PROJECT COST= 11,930.00 APF2- 1 7-95 MON 1 2 3@ TO: WYMAN MORGAN, INTERIM GENERAL MANAGER FROM: JOHN NEWSOM, WASTEWATER SUPERINTENDENT RE: OK ST. PUMP STATION THE PUMPS IN THIS STATION NEED TO BE REPLACED. THESE PUMPS WERE MANUFACTURED IN 1956. I RECOMMEND WE REPLACE THESE PUMPS WITH GORMAN-RUPP MODEL T4A3B 4" SELF PRIMING CENTRIFUGAL SEWAGE PUMPS. MY RECOMMENDATION IS BASED ON SEVERAL FACTORS. ALL WASTEWATER EMPLOYEES HAVE BEEN FACTORY TRAINED IN MAINTENANCE AND REPAIR OF THESE PUMPS. THE MAJORITY OF THE DEPARTMENTS CENTRIFUGAL VERTICAL SUCTION PUMPS ARE THIS BRAND AS WELL, WE ALSO STOCK REPAIR PARTS FOR THIS MODEL. THE INSTALLATION OF THIS PUMP WILL ALLOW THE DRY PIT SIDE OF THE EXISTING PUMP STATION TO BE CONVERTED FOR ADDITIONAL WET WELL STORAGE WHICH WILL DOUBLE THE CAPACITY OF STORAGE. THIS IS NEEDED DUE TO THE INCREASED FLOWS DURING WET WEATHER CONDITIONS AND SHOULD HELP PREVENT WASTEWATER BACKUP IN THE SYSTEM DURING THESE PERIODS.